Do-again set for Lutak Road section
June 17, 2010
The state will resurface a 100-foot section of new roadway near 1.2 Mile Lutak Road after cracks opened in the asphalt there last winter.
Located on the northbound shoulder of the road, the cracks run parallel to the road for about 30 feet and...
For access to this article please
sign in or
subscribe.