By CVN Staff 

Do-again set for Lutak Road section

 

June 17, 2010



The state will resurface a 100-foot section of new roadway near 1.2 Mile Lutak Road after cracks opened in the asphalt there last winter.

Located on the northbound shoulder of the road, the cracks run parallel to the road for about 30 feet and...



For access to this article please sign in or subscribe.

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2025