Harbor expansion design at 95 percent
The Haines Borough this week released the 95-percent design documents for the Small Boat Harbor expansion project, with changes from the 65-percent design that include a shorter steel wave barrier, less dredging in the north part of the harbor, an...
For access to this article please
sign in or
subscribe.