Klehini Bridge open to traffic

 

August 24, 2017



The six-year effort to replace the old bridge, originally put in by Jon Schnabel, began in 2011 after the Alaska Department of Transportation determined the bridge was structurally unsound after finding cracks, stress fractures and damaged bracing...



For access to this article please sign in or subscribe.

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2025