Contractor claims sea floor too hard, again

 

November 9, 2017



Pacific Pile and Marine filed a second claim with the Haines Borough alleging the sea floor is harder than was described in PND Engineers’ analysis of the harbor basin.

The contractor notified the borough of its first claim in July and later pro...



For access to this article please sign in or subscribe.

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2025